Auger Boring and Drilling · Orange County
Auger Boring and Drilling in Doctor Phillips, FL
Owners, builders and utilities in Doctor Phillips call a boring contractor because something has to go in the ground where the surface is spoken for. Directional drilling and auger boring place conduit, casing and pipe underneath roads, slabs, canals and lawns from pits a few feet square.
Serving Doctor Phillips · Orange County
Davis Underground Solutions, Inc.
Auger boring and drilling and every other boring method, with locates, bore plan and permits handled. More about Davis Underground Solutions →
Auger Boring and Drilling in Doctor Phillips: what gets installed
Cased auger bores for road, highway and railroad crossings and for gravity sewer that has to hold an exact grade: a straight steel casing jacked from a pit.
Dr. Phillips sits between the lakes and the Restaurant Row corridor; residential services and restaurant-lot crossings are the typical job.
How a bore in Doctor Phillips is done
A bore in Doctor Phillips is planned backward from the product: the bend the pipe can take, the cover the permit requires under the road or the canal, and the sand and water along the path set the entry angle and the length. One or more reaming passes open the pilot hole; the pipe or conduit is pulled back on the last pass with a swivel.
Hiring a auger boring and drilling contractor in Doctor Phillips
Price in Doctor Phillips comes down to the length of the bore, the size and material of the product, what it crosses, the cover the permit demands and the ground. Send a sketch through the form on this page and Davis Underground Solutions, Inc. replies within 24 hours; or call (855) 520-2670 now, since estimates are free.
The full write-up for the county is on the auger boring and drilling page for Orange County.
Estimates are free. Call now: (855) 520-2670.
Questions about auger boring and drilling in Doctor Phillips
Push length?+
60 to 200 feet in one push covers most crossings; longer calls for two pits and a mid-crossing structure.
Push length?+
60 to 200 feet in one push covers most crossings; longer calls for two pits and a mid-crossing structure.
How soon can a bore in Doctor Phillips be scheduled?+
Small residential and commercial bores are usually on the calendar within a week or two of the site walk; crossings follow the permit. Sunshine 811 needs two full business days before the pits are dug, and the contractor files it.
Other drilling and boring services in Doctor Phillips
Directional Drilling Doctor Phillips
Horizontal directional drilling (HDD): a steered bore between two small pits that puts conduit, pipe and cable under roads, driveways, parking lots and landscaping with no open trench.
Horizontal Drilling Doctor Phillips
Horizontal drilling for any line that has to cross something it cannot cut through: a street, a slab, a canal, a stand of trees. Entry pit, exit pit, nothing opened in between.
Directional Boring Doctor Phillips
Directional boring is the small-rig end of HDD: short, shallow bores for service lines, sleeves and conduit on residential and light-commercial lots.
Underground Drilling Doctor Phillips
Underground drilling for new utilities where the surface is spoken for: tracked, steered bores placed under whatever is already built on top.
Fiber Optic Cable Drilling Doctor Phillips
Fiber duct and drop conduit installed by directional drill for carriers, co-ops, campuses and developments: long shots along the right-of-way, short shots to the building.
Electrical Conduit Drilling Doctor Phillips
PVC and HDPE electrical conduit bored under pavement for primary feeds, secondary services, site lighting and EV charging circuits.
Underground Conduit Drilling Doctor Phillips
Single ducts and multi-duct bundles pulled through one reamed bore: communications, power, controls and spares placed together under the obstacle.
Structured Cable Drilling Doctor Phillips
Conduit between buildings for structured cabling, campus networks, security and controls, bored under courtyards, drives and parking rather than cut across them.
Utility Drilling Doctor Phillips
Utility drilling for water, sewer, gas, power and telecom owners: permitted road crossings, mains under live streets, services to the meter.
Communications Drilling Doctor Phillips
Communications conduit and cable placed by directional drill: telecom, cable TV, cell-site backhaul and private networks, under roads and lots.
Missile Boring Doctor Phillips
Missile boring (pneumatic piercing) drives a steel mole through the soil for short, straight, shallow runs under a driveway or sidewalk: the quickest way to sleeve a lawn or a walk.
Sewer, Water and Drain Lines Doctor Phillips
New water services and mains, sewer force mains and laterals, and storm drains installed under roads, driveways and yards without trenching them open.
Auger Boring and Drilling in nearby Orange County communities
- Auger Boring and Drilling Pine Castle
- Auger Boring and Drilling Pine Hills
- Auger Boring and Drilling Sky Lake
- Auger Boring and Drilling South Apopka
- Auger Boring and Drilling Southchase
- Auger Boring and Drilling Taft
- Auger Boring and Drilling Tangelo Park
- Auger Boring and Drilling Tangerine
- Auger Boring and Drilling Union Park
- Auger Boring and Drilling Wedgefield
- Auger Boring and Drilling Williamsburg
- Auger Boring and Drilling Zellwood